ࡱ> QSPg #bjbjJJ 8H(ub(ub9d ppppp8LL1.Tdzzz0000000$=24l0p@0ppzz0XXXvpzpz0X0XX6'R-zT{PDv,z0001-_5_58-_5p-\X00X1_5 B 6:  SEQ CHAPTER \h \r 1SECTION 210800 COMMISSIONING FIRE PROTECTION SYSTEMS Latest Edition: 2-14-2019 See Underlined Text for Edits (Engineer shall edit specifications and blue text in header to meet project requirements. This includes but is not limited to updating Equipment and/or Material Model Numbers indicated in the specifications and adding any additional specifications that may be required by the project. Delete paragraphs not applicable to the project, and note some pertinent editors comments in this section by the University. Also turn off all Underlines.) GENERAL RELATED DOCUMENTS Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this section and all other sections of Division 21. The OPR and BOD documentation are included by reference for information only. SUMMARY This section includes the requirements for commissioning the fire protection systems, assemblies and equipment. DESCRIPTION The following equipment and/or accessories shall be commissioned as part of this project: Fire Protection Equipment Wet System Dry System Fire Pumps SUBMITTALS Refer to Division 01 Specification Section COMMISSIONING for CxAs role. Refer to Division 01 Specification Section SUBMITTAL PROCEDURES for specific requirements. Refer to Division 01 Specification Section COMMISSIONING for additional submittal requirements related to submittals of equipment to be commissioned and Cx specific submittals. COORDINATION Refer to Division 01 Specification Section COMMISSIONING for requirements pertaining to coordination during the commissioning process. GENERAL DOCUMENTATION With assistance from the installing contractors, the CxA will prepare Pre-Functional Checklists for all commissioned components, equipment, and systems. PRODUCTS TEST EQUIPMENT Refer to Division 01 Specification Section COMMISSIONING for requirements pertaining to testing equipment. EXECUTION TESTING PREPARATION Certify in writing to the CxA that the fire protection systems, subsystems, equipment, and accessories have been installed, calibrated and are operating according to the contract documents. Place systems, subsystems, and equipment into operating mode to be tested. (e.g. for pumps, normal shutdown, normal auto position, normal manual position, emergency power, and alarm conditions). Testing Instrumentation: Install measuring instruments and logging devices to record test data as directed by the CxA. GENERAL TESTING REQUIREMENTS The UMB Fire Marshal or their representative must be present for commissioning of all fire protection systems. Provide technicians, instrumentation, and tools to perform commissioning test at the direction of the CxA. Test all operating modes, interlocks, control responses, responses to abnormal or emergency conditions, response of building automation system controllers and sensors. The CxA along with the fire protection contractor shall provide detailed testing plans, procedures, and checklists for applicable fire protection systems, subsystems, and equipment. Tests will be performed using design conditions whenever possible. FIRE PROTECTION SYSTEMS, SUBSYSTEMS, AND EQUIPMENT TESTING PROCEDURES Testing and commissioning shall be performed in accordance with NFPA requirements. Procedures: Where applicable follow manufacturers written procedures. If no procedures are prescribed by the manufacturer, proceed as follows: Fire Protection Equipment: Includes fire pump, jockey pump, pump controllers valves, backflow preventers and flow switches. Verify that all equipment and accessories haves been installed in accordance with the manufactures recommendations and all equipment can be easily accessed for maintenance and operates as intended. Verify that all connections, controls, and accessories have been installed correctly and operates as intended. Verify that all equipment test, training, and startup procedures have been completed per the specifications. Verify that all required interfaces with Life Safety and/or the BAS have been installed correctly and operates as intended. Operate equipment as intended to ensure the design conditions are obtained. Wet Systems: Verify that specialty valves, trim, fittings, controls, and accessories have been installed correctly and operate as intended. Verify that excess pressure pumps and accessories have been installed correctly and operate as intended. Verify that specified tests of piping are complete. Coordinate with fire alarm system tests. Operate systems as required. Coordinate with fire pump tests. Operate systems as required. Dry Systems: Verify that specialty valves, trim, fittings, controls, and accessories have been installed correctly and operate correctly. Verify that air compressors and their accessories have been installed correctly and operate correctly. Verify that specified tests of piping are complete. Coordinate with fire alarm system tests. Operate systems as required. Coordinate with fire pump tests. Operate system as required. Start and run air compressor. Adjust operating controls and pressure settings. Fire Pumps: Final Checks Before Startup: Before startup perform the following preventive maintenance operations and checks: Lubricate oil lubricated bearings. Remove grease lubricated bearing covers and flush bearings with kerosene and thoroughly clean. Fill with new lubricant according to manufacturer's recommendations. Disconnect coupling and check electric motor for proper rotation. Rotation shall match direction of rotation marked on pump casing. Check that the pump is free to rotate by hand. Do not operate the pump if it is bound or if it drags even slightly until cause of trouble is determined and corrected. Starting procedure for pumps: Prime pump by opening suction valve and closing drains, and prepare pump for operation. Open sealing liquid supply valve if pump is so fitted. Start motor. Open discharge valve slowly. Observe leakage from stuffing boxes and adjust sealing liquid valve for proper flow to ensure lubrication of packing. Do not tighten gland immediately, but let packing run in before reducing leakage through stuffing boxes. Check general mechanical operation of pump and motor. Fire Hoses: Provide fire hoses in number, size, and of length required to reach a storm drain or other acceptable location to dispose of fire pump test water. These fire hoses are for field acceptance tests only and are not intended to become property of the Owner. END OF SECTION 210800     챬, Baltimore Bressler Research Building Seventh Floor Renovation Project No: 10-357 95% Construction Document Submission Phase March 11, 2011  DESIGN DEVELOPMENT PHASE Oct 20, 2011 GENERAL COMMISSIONING REQUIREMENTS 019113 - COMMISSIONING FIRE PROTECTION SYSTEMS 210800 -  PAGE 1  "$%&'4ELMS[\]abdfgݾxxndZMhfgh+T^B*CJphh:kB*CJphhhB*CJphhekB*CJphhB*CJphhfghnB*CJphhWfuB*CJph h+T^5aJh`% hBu\5aJh`% hi15aJh`% h5aJ ho5aJhnh5aJ h35aJ h*5aJhnh|a5aJhnh^,5aJjhnh^,5UaJMD E M _ ! o p x o $ & Fa$gd:k $ & Fa$gd"+W $ & Fa$gdo$a$gdo $^a$gdo$ & F >`>a$gdo $ & Fa$gd"+W $ & Fa$gd"+W$a$gd+T^ 3 @ B C D E M _     ! n o p } M N Ż~xof]f]Th`% h^uaJh`% hYaJh`% h|aaJhnhoaJ h|aaJ hhhek hhhoho hRho hxIhohnh|aaJhnh|a5aJh+T^h+T^5aJh^,B* CJphph@, hn6B* CJphph%B* CJphph.WB* CJphph@, hnB* CJphphi1B* CJphp N m n o    % . @ _ ` a b u 5BCKLYƽϳvmdmhhh aJhShRaJhc) hRB*aJphhhh"AaJ h aJ h:aJhhhc) aJhhhRaJhhh:kaJhWfuh >*aJhWfuh:kaJhWfuhYaJhWfuhY>*aJhWfuh:k>*aJh`% hYaJh`% h^uaJ *h`% h^uaJ'  `  Zcds $h^ha$gd( $ & Fa$gd( $ & Fa$gd( $ & Fa$gd"+W $ & Fa$gd"+W $^a$gd:k $ & Fa$gd:k $ & Fa$gd WYZbcdzƽuukbYPGbh:khyZ&aJh`% hHaJh`% hSaJh`% hyZ&aJhWfuh1A3>*aJhWfuhS>*aJhWfuhSaJhnhyZ&aJhhuhH5aJh HhR5aJhhhRaJhhh aJ h aJhnhRaJhnh(5aJ hR5aJhnhR5aJh:kh(aJh:kh(B* aJphPhnhApaJM)O $ & Fa$gdI= $ & Fa$gd"+W $ & Fa$gd3 $ & Fa$gd77 $ & Fa$gd"+W $ & Fa$gd:k $ & Fa$gdS $ & Fa$gd"+W $ & Fa$gdhu' 'KL)GQp5̺zrkdkd]dV h`% hI= h`% hcI h`% h^u h`% hGp?hWfuh3>*h`% ho\aJh`% h*aJh`% h"AaJh`% hBu\aJhWfuh3aJhWfuh3>*aJhWfuh1aJhWfuh:kaJh`% h^uaJ h:kaJh77h1aJhnh1aJhWfuh77aJhWfuh1A3>*aJh`% h1aJ!57MN?a   Iج{t h`% h3 h`% hb *h`% hI=hWfuh@J>*hGp? *h`% hGp? h`% hGp? h`% h h`% h> h`% hcI h`% h^u h`% h@J hhhbh:khbaJhWfuh3>* hWfuhI=h:k h`% hI= *hWfuh3>*h3-ocG* Ig $p^pa$gd $ & Fa$gd $ & Fa$gd"+W $p^pa$gdI= $ & Fa$gd:k $ & Fa$gdI=12U'(FG|o $ ha$gd@J$ p0^p`0a$gd@J$ & F @ 01$^@ `0a$gd $ & F @ @ 01$^@ `0a$gdVn $ a$gd+T^!$ & F hp @ p01$^p`0a$gdVn $ & Fa$gdI= /2@Uc!!!!"!#!!"""#"2"3"4"6"8"9":"<"="?"@"B"C"E"G"]"h"i""|obh\phnB* aJphph>+hnaJmH sH h>+aJmH sH h\phnaJh3h&Qjh&QUhnh4aJ hMkaJhnhRaJhnh^,aJ hhhhhI= h`% hI=h`% h_jnaJh`% hI=aJ h`% h2 h`% h"A h`% h@J h`% h+T^"G !!"!#!b?$ \0hp@ P !$`'0*-/2p5@8;=@CPF I^`a$gdI=!$ & F hp @ p01$^p`0a$gdI=$a$gd2$ & F @ @ 01$^@ `0a$gdVn$ & F @ 01$^@ `0a$gdVn #!""#"9";"<">"?"A"B"D"E"9$ \0hp@ P !$`'0*-/2p5@8;=@CPF Ia$gd H$ & F @ 1$^@ a$gdh$ & F @ 01$^@ `0a$gdh E"F"G"i""""" #N#O#P##{tmxgdDnxgdn $1$ $d1$gdJ`mgdn5 \0hp@ P !$`'0*-/2p5@8;=@CPF Id1$2 \0hp@ P !$`'0*-/2p5@8;=@CPF I1$ """"""""""""B#C#L#M#O#P#Q#R#n#v#w#######¸¸~wsokbYPhn0J5aJh30J5aJh*0J5aJh3hnhi1 h\phnhi10J5aJhn0J5aJ!jhTR5UaJmHnHuhTR0J5aJjh3CJOJQJUh3CJOJQJh3hnhmH sH jhnUmHnHuh\phnB* aJphph\phnaJh>+B* aJphp###########hnh^,aJh&Qh3CJOJQJ hP<h3jh\phn5UaJ*h+'5aJmHnHu*jh\phn5UaJh\phn5aJ ####9$ \0hp@ P !$`'0*-/2p5@8;=@CPF Ia$gd H $d1$gdJ`m6&P1F:pDn/ =!"#$%z s666666666vvvvvvvvv66666>666666666666666666666666666666666666666666666666hH6666666666666666666666666666666666666666666666666666666666666666662 0@P`p2( 0@P`p 0@P`p 0@P`p 0@P`p 0@P`p 0@P`p8XV~ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@ 0@_HmH nH sH tH <`< NormalCJ_HmH sH tH DA D Default Paragraph FontViV 0 Table Normal :V 44 la (k ( 0No List PP ?F0 Balloon TextCJOJQJaJmHsHtHN/N ?F0Balloon Text CharCJOJQJ^JaJ@@  [5 List Paragraph ^@@"@ 0Header  H$ mHsHtH2/12 0 Header CharCJ@ B@ 0Footer  H$ mHsHtH2/Q2 0 Footer CharCJDbD P<FTR$ $*$a$CJOJQJ^J"oq" P<NUM^J"o" P<NAM^J<< P<RJUST$a$CJOJQJ^J>> nCMT$*$a$ B*CJph:: ^uQuick 1.  & F1$h:O: ^uQuick a.  & F1$hDBD +T^ Body Text$ 1$a$h</< +T^Body Text CharCJhPK![Content_Types].xmlN0EH-J@%ǎǢ|ș$زULTB l,3;rØJB+$G]7O٭Vc:E3v@P~Ds |w< H cccfN 5"##!" G#!E"## # W^`f!@ @( (  D   "?D   "?/@0(  B S  ?fHr$Hu r$ uMfgz9;<>?ABDE 9;<>?ABDEGhi3&'MS[\] @_!nou%.._`u5CLL77WYbc   % ' V V  ' K L ) 5NO H?@bc!"89GO Q^;T\A4B=d29D Ol@:WYh"x rQj\E{nFg4z[z.p.^`o(.^`5OJPJQJ^J)^`.^`o(.^`o(.h^h`56;OJQJo(hH PART -  0^`0o(hH. P^`Po(hH. 0^`0o(hH. p0^p`0o(hH. @ 0^@ `0o(hH) 0@ ^`0o(hH) 0^`0o(hH() 0^`0o(hH.^`5OJPJQJ^J)^`OJPJQJ^J)h^h`56;OJQJo(hH PART -  0^`0o(hH.P^`PB*o(phhH. 0^`0o(hH. p0^p`0o(hH. @ 0^@ `0o(hH) 0@ ^`0o(hH) 0^`0o(hH() 0^`0o(hH.g4zE{nl@Q=d29rQjTYhA4WM0.pRM0.RM0.SM0.hTM0.TM0.PSM0.SM0.UM0.HUM0.`]M0.YM0.\M0.(]M0. XM0.]M0.h[M0.ZM0.^M0. "8U *s$l + [" 1mo0p~-`% c) !z*$7%{9%hX&yZ&Jd&$~&q' (!+>+^,7-?.Q. /#/?K/EN0121A34{4j'5 [57759Ua9:5\:P<I=*N>t ?Gp?BCE?FsF HdJKkLhM&Qo_Q1S)U.W"+Wq$ZBu\?]G]^+T^|Ka"dV1d ghIjk:kekek* lJ`mDnVn_jnrrt^u(uWfuu|%~=gWLY~Ubw@J>o\I ,nrHI6B\!bpiyL b9(3z{%' D9gu)<@*GzrobS0P%u]Tt"A%}y'i+V&cI?mzTRW`Y9YMkC\v3b{A U\/|ai1S{2y8K?+'w<nfgR%\m}](Q[eUft->Sq Ap3GHhu(I9;@@UnknownG.[x Times New Roman5Symbol3. .[x Arial5. .[`)TahomaA$BCambria Math"ژژT;(P /P /!,, JqHP  $P?F2!xx Jessica SouderKopchinski, Christy8         Oh+'0|   , 8 D P\dltJessica SouderNormalKopchinski, Christy2Microsoft Office Word@@Lc@2P@2PP ՜.+,0 hp   Microsoft/ ,  Title  !"#$&'()*+,-./0123456789:;<=>?ABCDEFGIJKLMNORRoot Entry FP{PT1Table%5WordDocument8HSummaryInformation(@DocumentSummaryInformation8HCompObjr  F Microsoft Word 97-2003 Document MSWordDocWord.Document.89q